Current U.S. Navy Shipbuilding Contracts                                 

Most recent update: March 17, 2012.


These data have been extracted from the contract announcements published on www.DefenseLink.mil.  There may be errors and omissions.  In addition, these are only published contract values and may bear no relation to actual costs.

"Gerald Ford"-Class Aircraft Carriers - CVN 78 and 79
HII Newport News
Date Scope FY $ Cum $
N00024-04-C-2118
21-May-04 CVN 21 Class Planning 04 182,454,576 182,454,576
29-Oct-04 CVN 21 Class Planning 05 492,124,592 674,579,168
1-Apr-05 CVN 21 Class Planning 05 50,631,371 725,210,539
7-Jun-05 CVN 21 Class Planning 05 9,208,229 734,418,768
15-Nov-05 CVN 21 Class Planning 06 558,661,410 1,293,080,178
30-Nov-06 CVN 21 Class Planning 07 754,011,210 2,047,091,388
11-Jan-08 CVN 21 Class Planning 08 595,944,566 2,643,035,954
N00024-07-C-2116
15-Nov-06 Planning for CVN 79 07 7,416,538 2,650,452,492
31-Jan-08 Planning for CVN 79 08 16,338,114 2,666,790,606
N00024-08-C-2110
10-Sep-08 Construction of CVN 78 08 5,114,500,788 7,781,291,394
27-Mar-09 LLTM for CVN 78 09 42,994,547 7,824,285,941
12-May-10 Detail Engineering for CVN 78 10 186,632,406 8,010,918,347
10-Nov-10 Detail Engineering for CVN 78 11 189,214,000 8,200,132,347
25-Jan-11 Detail Engineering for CVN 78 11 10,960,474 8,211,092,821
29-Jul-11 Detail Engineering for CVN 78 11 504,075,053 8,715,167,874
N00024-09-C-2116
15-Jan-09 Planning for CVN 79 09 373,911,532 9,089,079,406
11-May-09 LLTM for CVN 79 09 77,266,923 9,166,346,329
23-Dec-09 LLTM for CVN 79 10 31,752,000 9,198,098,329
20-Apr-10 LLTM for CVN 79 10 16,769,544 9,214,867,873
15-May-10 LLTM for CVN 79 10 77,266,823 9,292,134,696
7-Sep-10 LLTM for CVN 79 10 12,048,638 9,304,183,334
30-Sep-10 LLTM for CVN 79 11 37,800,000 9,341,983,334
5-Nov-10 LLTM for CVN 79 11 55,127,166 9,397,110,500
8-Dec-10 Construction prep. for CVN 79 11 323,611,867 9,720,722,367
11-Aug-11 Construction prep. for CVN 79 11 56,577,660 9,777,300,027
26-Oct-11 Construction prep. for CVN 79 12 16,884,918 9,794,184,945
21-Dec-11 Construction prep. for CVN 79 12 113,230,682 9,907,415,627
"Virginia"-Class Attack Submarines - SSN 774 to 803
GD Electric Boat and HII Newport News
Date Scope FY $ Cum $
N00024-96-C-2100
29-Jan-96 Design of NSSN 96 1,468,800,000 1,468,800,000
24-Mar-97 Design of NSSN 97 39,098,796 1,507,898,796
6-Jun-97 LLTM 97 34,665,110 1,542,563,906
12-Dec-97 Design of NSSN 98 6,728,444 1,549,292,350
15-Dec-97 LLTM 98 82,854,151 1,632,146,501
30-Sep-98 SSNs 774, 775, 776 and 777 99 4,236,700,037 5,868,846,538
N00024-00-C-2112
29-Sep-00 Lead yard services 01 77,787,743 5,946,634,281
4-May-01 Lead yard services 01 42,222,584 5,988,856,865
6-Apr-02 Lead yard services 02 52,541,054 6,041,397,919
25-Sep-02 Lead yard services 03 48,219,204 6,089,617,123
3-Apr-03 Lead yard services 03 59,255,088 6,148,872,211
22-Sep-03 Lead yard services 04 43,497,352 6,192,369,563
5-Apr-04 Lead yard services 04 64,045,747 6,256,415,310
3-Feb-05 Lead yard services 05 40,583,735 6,296,999,045
N00024-03-C-2101
14-Aug-03 SSNs 778 and 779 03 8,687,903,765 14,984,902,810
30-Jan-04 Revision to the above 03 8,447,168,122 14,744,167,167
28-Dec-04 SSN 780 and AP for 781 05 1,503,050,893 16,247,218,060
30-Jan-06 SSN 781 and AP for 782 06 1,108,787,793 17,356,005,853
28-Dec-06 SSN 782 and AP for 783 07 1,274,545,405 18,630,551,258
30-Nov-07 LLTM for 784 08 270,000,000 18,900,551,258
20-Mar-08 LLTM for 784 and 787 09 324,937,789 19,225,489,047
28-Jan-10 SSN 778 PSA 10 23,661,596 19,249,150,643
1-Jul-10 SSN 779 PSA 10 51,753,660 19,300,904,303
21-Jan-11 SSN 780 PSA 11 44,328,600 19,345,232,903
14-Sep-11 Masts 11 32,988,378 19,378,221,281
N00024-09-C-2104
22-Dec-08 SSNs 784 to 791 09 14,011,153,563 33,389,374,844
10-Feb-11 Design for affordability 11 59,963,504 33,449,338,348
N00024-10-C-2118
2-Jul-10 Lead yard services 10 171,856,353 33,621,194,701
29-Oct-10 Lead yard services 11 174,486,588 33,795,681,289
21-Sep-11 Lead yard services 12 174,486,588 33,970,167,877
26-Oct-11 Lead yard services 12 91,151,493 34,061,319,370
"Zumwalt"-Class Destroyers - DDG 1000 to 1002
N00024-06-C-2304 - HII Ingalls
31-Aug-06 DDG 1000 Project Dvlpmt. 06 95,892,863 95,892,863
29-Jan-07 DDG 1000 Project Dvlpmt. 07 268,099,114 363,991,977
6-Apr-07 DDG 1000 Project Dvlpmt. 07 7,499,944 371,491,921
5-Jun-07 DDG 1000 Project Dvlpmt. 07 191,119,037 562,610,958
11-Jun-07 DDG 1000 Project Dvlpmt. 07 9,986,434 572,597,392
9-Nov-07 DDG 1000 Project Dvlpmt. 08 90,000,000 662,597,392
14-Feb-08 DDG 1001 08 1,402,539,861 2,065,137,253
12-Feb-09 DDG 1001 09 8,999,980 2,074,137,233
19-Apr-10 DDG 1000 10 9,818,797 2,083,956,030
2-Aug-10 DDG 1000 10 17,224,434 2,101,180,464
31-Oct-11 DDG 1000 12 13,000,000 2,114,180,464
2-Dec-11 DDG 1002 12 46,079,303 2,160,259,767
N00024-06-C-2303 - GD Bath Iron Works
8-Aug-06 DDG 1000 Project Dvlpmt. 06 115,831,638 115,831,638
29-Jan-07 DDG 1000 Project Dvlpmt. 07 257,473,700 373,305,338
20-Mar-07 DDG 1000 Project Dvlpmt. 07 12,550,000 385,855,338
11-Jun-07 DDG 1000 Project Dvlpmt. 07 197,071,953 582,927,291
9-Nov-07 DDG 1000 Project Dvlpmt. 08 141,999,995 724,927,286
14-Feb-08 DDG 1000 08 1,395,382,679 2,120,309,965
1-Dec-08 DDG 1000 09 45,800,301 2,166,110,266
21-Oct-09 DDG 1000 09 79,452,144 2,245,562,410
6-Jan-10 DDG 1000 10 6,862,387 2,252,424,797
4-Feb-10 DDG 1000 10 9,000,000 2,261,424,797
17-Feb-10 DDG 1000 10 7,921,004 2,269,345,801
19-Apr-10 LLTM for DDG 1001 10 15,957,499 2,285,303,300
7-May-10 Additional design services 10 26,755,525 2,312,058,825
22-Jun-10 DDG 1000 10 8,300,858 2,320,359,683
6-Jul-10 DDG 1000 and 1001 10 105,353,508 2,425,713,191
6-Oct-10 Additional design services 11 27,056,613 2,452,769,804
12-Nov-10 Additional design services 11 8,494,937 2,461,264,741
18-Mar-11 LLTM for DDG 1001 11 27,985,375 2,489,250,116
4-May-11 Additional design services 11 18,800,000 2,508,050,116
17-May-11 LLTM for DDG 1001 11 29,888,155 2,537,938,271
4-Aug-11 LLTM for DDG 1001 and 1002 11 110,799,779 2,648,738,050
1-Nov-11 Additional design services 12 14,392,031 2,663,130,081
22-Dec-11 Additional design services 12 17,600,000 2,680,730,081
N00024-11-C-2306 - GD Bath Iron Works
15-Sep-11 DDG 1001 and 1002 12 1,825,665,914 4,474,403,964
"Arleigh Burke"-Class Destroyers - DDG 51 to 115
GD Bath Iron Works and HII Ingalls Shipbuilding
Date Scope FY $ Cum $
Pre-1995 Contracts - GD Bath Iron Works
2-Apr-85 DDG 51 85 318,000,000 318,000,000
25-Sep-87 DDG 53 87 190,000,000 508,000,000
13-Dec-88 DDG 54, 56 and 58 89 609,000,000 1,117,000,000
22-Feb-90 DDG 60 and 62 90 512,000,000 1,629,000,000
16-Jan-91 DDG 64 and 66 91 514,000,000 2,143,000,000
8-Apr-92 DDG 68 and 70 92 500,000,000 2,643,000,000
19-Jan-93 DDG 72, 73, 75 and 76 93 996,000,000 3,639,000,000
20-Jul-94 DDG 77 and 79 94 648,000,000 4,287,000,000
Pre-1995 Contracts - NGSB Pascagoula
26-May-87 DDG 52 87 162,000,000 4,449,000,000
13-Dec-88 DDG 55 and 57 89 446,000,000 4,895,000,000
22-Feb-90 DDG 59, 61 and 63 90 615,000,000 5,510,000,000
16-Jan-91 DDG 65 and 67 91 510,000,000 6,020,000,000
8-Apr-92 DDG 69 and 71 92 572,000,000 6,592,000,000
19-Jan-93 DDG 74 93 353,000,000 6,945,000,000
20-Jul-94 DDG 78 94 330,000,000 7,275,000,000
N00024-94-C-2800 - NGSB Pascagoula
6-Jan-95 DDG 80 and 82 95 738,773,000 8,013,773,000
N00024-94-C-2808 - GD Bath Iron Works
6-Jan-95 DDG 81 95 367,647,705 8,381,420,705
N00024-96-C-2304 - NGSB Pascagoula
20-Jun-96 DDG 84 96 329,538,211 8,710,958,916
13-Dec-96 DDG 86 and 88 97 659,402,802 9,370,361,718
5-May-97 AP 97 164,700,000 9,535,061,718
N00024-96-C-2305 - GD Bath Iron Works
20-Jun-96 DDG 83 96 348,478,997 9,883,540,715
22-Jul-96 AP 96 104,000,000 9,987,540,715
13-Dec-96 DDG 85 and 87 97 675,515,017 10,663,055,732
5-May-97 AP 97 164,700,000 10,827,755,732
N00024-98-C-2306 - GD Bath Iron Works
6-Mar-98 DDG 90 and 92 98 711,024,220 11,538,779,952
6-Mar-98 AP 98 119,059,334 11,657,839,286
  DDG 94 99 366,000,000 12,023,839,286
16-Dec-99 DDG 96 00 324,071,772 12,347,911,058
8-Dec-00 DDG 99 and 101 01 660,822,858 13,008,733,916
N00024-98-C-2307 - NGSB Pascagoula
6-Mar-98 DDG 89 and 91 98 701,225,361 13,709,959,277
6-Mar-98 AP 98 155,768,666 13,865,727,943
  DDG 93 and 95 99 620,000,000 14,485,727,943
16-Dec-99 DDG 97 and 98 00 660,040,081 15,145,768,024
8-Dec-00 DDG 100 01 338,218,386 15,483,986,410
N00024-01-C-2307 - GD Bath Iron Works
5-Jun-01 AP 01 154,974,000 15,638,960,410
1-Aug-02 DDG 102 02 464,373,508 16,103,333,918
  DDG 104 03 464,373,508 16,567,707,426
N00024-01-C-2308 - NGSB Pascagoula
5-Jun-01 AP 01 154,974,000 16,722,681,426
21-Dec-01 DDG 103 02 369,831,838 17,092,513,264
N00024-02-C-2303 - GD Bath Iron Works
27-Dec-02 DDG 106 03 409,117,056 17,501,630,320
23-Dec-03 DDG 108 and 109 04 953,448,087 18,455,078,407
16-Nov-04 DDG 111 05 488,647,719 18,943,726,126
21-Jan-05 DDG 112 06 562,141,766 19,505,867,892
N00024-02-C-2304 - NGSB Pascagoula
27-Dec-02 DDG 105 03 401,590,928 19,907,458,820
23-Dec-03 DDG 107 04 419,716,219 20,327,175,039
16-Nov-04 DDG 110 05 470,011,059 20,797,186,098
N00024-10-C-2308 - HII Ingalls
2-Dec-09 DDG 113 LLTM 10 170,700,000 20,967,886,098
23-Apr-10 DDG 114 LLTM 10 114,003,000 21,081,889,098
2-Jun-11 DDG 113 LLTM 11 25,300,000 21,107,189,098
N00024-10-C-2311 - GD Bath Iron Works
26-Feb-10 DDG 115 LLTM 10 114,003,000 21,081,889,098
N00024-11-C-2309 - HII Ingalls
15-Jun-11 DDG 113 11 783,572,487 21,865,461,585
26-Sep-11 DDG 114 11 697,629,899 22,563,091,484
N00024-11-C-2305 - GD Bath Iron Works
26-Sep-11 DDG 115 11 679,600,348 23,242,691,832
28-Feb-12 DDG 116 11 662,927,172 23,905,619,004
"America"-Class Assault Ships - LHA 6 to 10
HII Ingalls
Date Scope FY $ Cum $
N00024-05-C-2221
14-Jul-05 Planning, LLTM, etc. 05 109,865,504 109,865,504
13-Feb-06 Design 06 93,825,694 203,691,198
15-Jun-06 Special studies 06 20,378,352 224,069,550
1-Jun-07 LHA 6 07 2,400,000,000 2,624,069,550
"San Antonio"-Class Assault Ships - LPD 17 to 26
HII Ingalls and HII Avondale
Date Scope FY $ Cum $
N00024-97-C-2202
17-Dec-96 LPD 17 96 641,370,625 641,370,625
14-Jul-98 LLTM for 18 98 78,000,000 719,370,625
4-Aug-98 Engineering 98 9,712,000 729,082,625
18-Dec-98 LPD 18 99 312,753,427 1,041,836,052
15-Feb-00 LPD 19 00 491,914,485 1,533,750,537
30-May-00 LPD 20 00 477,675,955 2,011,426,492
28-Mar-01 Engineering 01 11,302,389 2,022,728,881
N00024-01-C-2224
19-Jul-01 LLTM for 21 and 22 01 113,239,771 2,135,968,652
30-Jul-02 LLTM for 21 and 22 02 171,050,850 2,307,019,502
25-Nov-03 LPD 21 03 816,647,000 3,123,666,502
26-May-04 LLTM for 22 04 100,414,220 3,224,080,722
17-Aug-04 LLTM for 23 04 107,121,910 3,331,202,632
23-Dec-04 LLTM for 22 and 23 05 165,104,690 3,496,307,322
10-Feb-05 Engineering 05 26,905,249 3,523,212,571
30-Sep-05 Engineering 06 22,450,527 3,545,663,098
18-Oct-05 LLTM for 22 and 23 06 50,705,631 3,596,368,729
N00024-06-C-2222
1-Jun-06 LPD 22 and 23 06 2,491,389,968 6,087,758,697
29-Sep-06 Engineering 07 13,320,180 6,101,078,877
6-Nov-06 LPD 24 and LLTM for 25 07 1,454,286,932 7,555,365,809
21-Dec-07 LPD 25 08 1,003,329,142 8,558,694,951
4-Dec-08 Engineering 09 16,801,209 8,575,496,160
19-Dec-08 LLTM for 26 09 9,950,000 8,585,446,160
23-Jun-09 LLTM for 26 09 213,772,399 8,799,218,559
30-Apr-10 LLTM for 26 10 184,000,507 8,983,219,066
20-Oct-10 LLTM for 27 11 62,000,000 9,045,219,066
1-Apr-11 LLTM for 27 11 62,000,000 9,107,219,066
13-Jul-11 LPD 26 11 1,496,200,000 10,603,419,066
N00024-10-C-2203
16-Feb-10 Engineering 10 41,288,005 10,603,419,066
30-Nov-10 Engineering 11 43,739,721 10,603,419,066
22-Nov-11 Engineering 12 51,342,168 10,603,419,066
"Freedom"-Class Littoral Combat Ships - LCS 1 to ??
Lockheed Martin/Marinette/Bollinger
Date Scope FY $ Cum $
N00024-03-C-2311
17-Jul-03 Prelim. Design 03 9,993,359 9,993,359
27-May-04 Engineering 04 46,501,821 56,495,180
27-May-04 LCS 1 and 3 04 423,381,195 479,876,375
15-Dec-04 LCS 1 05 188,190,866 668,067,241
26-Jun-06 LCS 3 06 197,644,515 865,711,756
12-Apr-07 LCS 3 Cancelled 07 -197,644,515 668,067,241
23-Mar-09 LCS 3 Reordered 09 470,864,144 1,138,931,385
GD Bath Iron Works/Austal USA
Date Scope FY $ Cum $
N00024-03-C-2310
17-Jul-03 Prelim. Design 03 8,900,000 8,900,000
27-May-04 Engineering 04 78,798,188 87,698,188
27-May-04 LCS 2 and 4 04 536,020,688 623,718,876
11-Apr-05 LLTM 05 16,000,000 639,718,876
14-Oct-05 LCS 2 06 223,262,430 862,981,306
8-Dec-06 LCS 4 06 208,060,756 1,071,042,062
1-Nov-07 LCS 4 Cancelled 07 -208,060,756 862,981,306
1-May-09 LCS 4 Reordered 09 433,686,769 1,296,667,075
Lockheed Martin/Marinette Marine
Date Scope FY $ Cum $
N00024-11-C-2300
29-Dec-10 LCS 5 10 436,852,639 436,852,639
29-Dec-10 Technical data etc. 10 54,742,639 491,595,278
15-Mar-11 Special studies 11 34,111,626 525,706,904
17-Mar-11 LCS 7 11 376,621,375 902,328,279
19-Dec-11 Class services 12 11,855,315 914,183,594
14-Mar-12 Special studies 12 33,649,198 947,832,792
16-Mar-12 LCS 9 and 11 12 715,000,351 1,662,833,143
Austal USA
Date Scope FY $ Cum $
N00024-11-C-2301
29-Dec-10 LCS 6 10 432,069,883 432,069,883
29-Dec-10 Technical data etc. 10 33,398,998 465,468,881
15-Mar-11 Special studies 11 19,665,646 485,134,527
17-Mar-11 LCS 8 11 368,592,125 853,726,652
19-Dec-11 Class services 12 7,917,425 861,644,077
14-Mar-12 Special studies 12 19,692,295 881,336,372
16-Mar-12 LCS 10 and 12 12 691,599,014 1,572,935,386
"Ambassador III"-Class Fast Missile Craft for Egypt - FMC 1 to 4
VT Halter Marine
Date Scope FY $ Cum $
N00024-06-C-2212
30-Nov-05 Functional Design 06 28,856,051 28,856,051
21-Nov-06 LLTM 07 165,465,868 194,322,019
22-Jun-07 LLTM 07 41,534,132 235,856,151
26-Sep-08 FMC 1 to 3 08 393,722,502 629,578,653
26-Mar-10 FMC 4 10 165,361,305 794,939,958
"Lewis and Clark"-Class Logistic Ships - T-AKE 1 to 14
GD NASSCO
Date Scope FY $ Cum $
N00024-02-C-2300
18-Oct-01 T-AKE 1 00 406,883,256 406,883,256
18-Oct-01 T-AKE 2 00 301,636,200 708,519,456
16-Jul-02 T-AKE 3 01 289,891,274 998,410,730
18-Jul-03 T-AKE 4 03 287,607,091 1,286,017,821
27-Jan-04 T-AKE 5 and 6 04 578,206,817 1,864,224,638
10-Jan-05 T-AKE 7 and 8 05 586,266,939 2,450,491,577
30-Jan-06 T-AKE 9 06 317,113,310 2,767,604,887
20-Jul-07 LLTM for 10 07 100,000,000 2,867,604,887
31-Jan-08 T-AKE 10 and LLTM for 11 08 459,780,045 3,327,384,932
10-Jun-08 LLTM for 12 08 100,000,000 3,427,384,932
12-Dec-08 T-AKE 11 and 12 09 940,378,173 4,367,763,105
26-Feb-10 T-AKE 13 and 14 10 824,642,437 5,192,405,542
"Montford Point"-Class Mobile Landing Platforms - MLP 1 to 3
GD NASSCO
Date Scope FY $ Cum $
N00024-09-C-2229
22-Dec-09 Design 10 7,000,000 7,000,000
7-Apr-10 Design 10 10,000,000 17,000,000
13-Aug-10 LLTM and design 10 115,000,000 132,000,000
27-May-11 MLP 1 and 2 11 744,129,958 876,129,958
30-Jun-11 LLTM for MLP 3 11 60,000,000 936,129,958
27-Feb-12 MLP 3 12 359,750,000 1,295,879,958
"Spearhead"-Class Joint High-Speed Vessels - JHSV 1 to 10
Austal USA
Date Scope FY $ Cum $
N00024-08-C-2217
31-Jan-08 Prelim. Design 08 3,000,000 3,000,000
13-Nov-08 JHSV 1 09 185,433,564 188,433,564
19-Jun-09 LLTM for 2 and 3 09 99,547,548 287,981,112
28-Jan-10 JHSV 2 and 3 09 204,238,728 492,219,840
4-Jun-10 LLTM for 4 and 5 10 99,557,548 591,777,388
12-Oct-10 JHSV 4 and 5 10 204,652,897 798,430,285
30-Jun-11 JHSV 6 and 7 11 312,939,336 1,111,369,621
24-Feb-12 JHSV 8 and 9 12 321,725,461 1,433,095,082
"Lorenzen"-Class Missile Range Instrumentation Ship - T-AGM 25
VT Halter Marine
Date Scope FY $ Cum $
N00024-06-C-2215
  Phase I - Design 06   0
26-Sep-06 T-AGM 25 07 199,173,420 199,173,420
"TBD"-Class Oceanographic Research Ships - AGOR 27 and 28
Dakota Creek Industries
N00024-10-C-2201
Date Scope FY $ Cum $
26-Jan-10 Phase I - Design 10 1,500,000 1,500,000
14-Oct-11 AGOR 27 12 74,141,319 75,641,319
3-Feb-12 AGOR 28 12 70,966,513 146,607,832
"Pathfinder"-Class Survey Ships - T-AGS 60 to 66
Halter Marine/VT Halter Marine
Date Scope FY $ Cum $
Pre-1995 Contracts
30-Jan-91 T-AGS 60 91 49,900,000 49,900,000
30-Jan-91 T-AGS 61 91 45,900,000 95,800,000
29-May-92 T-AGS 62 92 40,000,000 135,800,000
N00024-95-C-2301
20-Oct-94 T-AGS 63 95 46,984,379 182,784,379
13-Jan-97 T-AGS 64 97 51,686,293 234,470,672
21-Dec-98 T-AGS 65 99 53,618,360 288,089,032
N00024-10-C-2239
22-Dec-09 T-AGS 66 10 86,742,759 374,831,791